Finishings spanwright slabs
|
|
| |
|
Slab with non structural screed |
|
 |
| |
|
|
| 1. |
Non Structural screed. |
| 2. |
Insulation. |
| 3. |
Special designed shear key ties slabs together into one unit. |
| |
| 4. |
Services for above and below located in screed. |
| 5. |
35N10 grout in shear keys. |
| |
|
| |
|
Slab with timber batten finish |
|
 |
| |
|
|
| 1. |
Floorboards/finished floor fixed to timber batten. |
| 2. |
Timber batten placed on floor. |
| 3. |
Electrical services fixed to battens. |
| 4. |
35N10 grout in shear keys. |
| 5. |
Plaster applied directly to textured soffit of slab. |
| 6. |
Heating pipes located between battens. |
| |
|
| |
Rubber spacers are often placed between the battens and the slab to reduce the tranfer of impact noise through the floor. |
| |
|
| |
|
EasyFix™ Flooring Systems |
|


|
| |
|
|
|
| |
* |
Batten a Timber in 1/2 the time |
| |
* |
Labour Saving Product or D.I.Y.
allows services to pass easily. |
| |
* |
Floating Floor, so no drilling or express nails! |
| |
* |
No piercing of DPC or Radon Barrier EasyFix™ levellers make levelling simple |
| |
* |
No "Squeaks and Creaks" |
| |
* |
Creates a Moisture barrier |
| |
* |
Acoustic saddle reducing impact noise by 24dB passing building regulations and NHBC |
| |
* |
Use around 6 Batten Fixers per M2 |
|
|
|
|
| |
|
Slab with structural screed |
|
 |
| |
|
|
| |
(used where higher loadings are required) |
| 1. |
Structural screed. |
| 2. |
Slabs coated with bonding before placing of structural screed. |
| |
| 3. |
Services fixed to battens below slabs. |
| 4. |
Plasterboard finish below. |
| 5. |
Concrete screed placed along with grouting of shear keys. |
| |
| 6. |
Timber battens placed in shear key to receive fixings from below. |
| |
| |
|
| Requirements for a screed will be indicated on your customer drawing. |
| |
| |
|
Plaster direct to Slabs |
|
|
| |
|
| SpanWright floors have a textured soffit to allow a bond and skim finish to be applied directly to the slab. |
| |
|
| |
|
Cost Effective Finishing |
|
|
| Dropped ceilings allow room for placing services underneath the slabs. Battens can be placed between slabs at the time of fitting to make counter battening easier. |
|
| |
|
|
|
|
| |
|
| |